RULE: 34.4 - MISCELLANEOUS SERVICES AND CHARGES: Eff: 01OCT2006
| Effective | 01OCT2006 |
|---|---|
| Filing Codes | A |
A. DEMURRAGE:
Demurrage is the charge assessed against IMPORT and
EXPORT containers and/or cargo therein, remaining in open
yard storage after the expiration of Free Time period
unless prior arrangements have been made with the Terminal
Operator for such storage of Full containers. FREE TIME
begins at 12:01 AM on the first working day after
placement of the container in the terminal.
ITEM 17. EMPTY CONTAINER STORAGE:
Storage formula is based on the monthly total of empty
TEU's times FIVE (5) to determine the allowable free
days. Allowable free days will be deducted from the total
TEU container days to determine chargeable storage
days. The chargeable container days will be assessed
at the rate of $2.80 per TEU.
For those lines that average over 15 days aging on empties
during the month an extended dwell time charge will be
assessed in addition to the normal empty container storage
charge as follows: (monthly average empty days aging - 15)*
Monthly empty TEU throughput * $5.00
ITEM 18. FULL CONTAINER STORAGE:
1. Free Time Period:
Export Containers
Dry 7 Calendar Days
Reefer 2 Working Days
Vehicle exceptions due to
Customs and Border Patrol
requirements: By Arrangement
Import Containers
Dry 5 Working Days
Reefer 3 Working Days
2. Demurrage Charges:
(A) Export Containers:
Will not be accepted before free time period
Reefers over 2 working days $25.00 per TEU/Day
(B) Import Containers:
Dry 6-10 Calendar Days $15.00 per TEU/Day
11-15 " " $30.00 per TEU/Day
Over 15 " " $45.00 per TEU/Day
Reefers over 3 working days $30.00 per TEU
3. Any demurrage accrued due to Customs or Agricultural
holds are for the account of the Cargo.
4. Full Container Storage:
Applicable only on dry import containers, provided all
such containers are from one shipper to one consignee,
one port of loading to one port of discharge on one
vessel, on one bill of lading, and at least ten (10)
containers are removed from the terminal within the
free time period as defined in ITEM 18 (1) above. The
steamship line must advise POMTOC in writing prior to
discharge with copy of the bill of lading.
Extra Free Time
(Calendar Days)
11 to 12 containers inclusive 1 day
13 to 14 containers inclusive 2 days
15 to 16 containers inclusive 3 days
17 to 18 containers inclusive 4 days
19 to 20 containers inclusive 5 days
21 to 22 containers inclusive 6 days
23 to 24 containers inclusive 7 days
25 containers and over by arrangement
ITEM 19. INSPECTION SERVICES:
A. PPQ Inspection
(1) Unstack/set down/inspect/restack $100.00 per Box
(2) Unstack/dray to shed/return
restack $125.00 per Box
Plus applicable
gate charges
and Security
Fees.
B. U.S. Customs Inspection
Dray to Shed
includes unstacking/stacking $125.00 per Box
Plus applicable
gate charges
and Security
Fees.
C. Inspections (survey/repair)
Unstack/Stack Empty container $ 30.00 per Box
Loaded container $100.00 per Box
D. Inspection by U.S. Customs and Border
Protection, U.S. Coast Guard or other
U. S. Government agencies within the
terminal, for loaded or empty containers
including unstacking, grounding, and
restacking:
Loaded Import Container $100.00 per Box
Loaded Export Container $100.00 per Box
Empty Container $ 30.00 per Box
E. Fumigation
Dray to fumigation area & return
includes unstacking/stacking $125.00 per Box
F. Preparation and furnishing services for US Customs
intensive examinations including (X-Ray examinations.)
$175.00 per box
G. Rates are based on straight time. Any services
performed during overtime hours will be charged by
arrangement.
ITEM 20. CONTAINER SERVICES:
A. Transshipment Containers
Unstack/Dray/Restack/TIR preparation $32.00 per Box
charge to importing
and exporting line.
Security Fee . . . . . . . . . . . . . . $2.375 per box
charge to importing
and exporting line.
Total Fee per Box . . . . . . . . . . . .$68.75 per box
B. Off-hire/For Sale Containers
If specific containers are not required and /or
notification is provided prior to vessel discharge
no charge for segregation.
If information is not provided prior to
vessel discharge a segregation/handling
fee will apply $30.00 per box
Delinquency fee beyond 2 working
days $10.50 per TEU/day
C. Rolling of Export Loads $75.00 per box
D. Handling of export re-deliveries $50.00 per box
E. Reefer container monitoring/power as per arrangement
F. Drayage on Island pick - up/delivery $62.50 per box
G. Late gate charge
(container yard/gate)
5:00-6:00 PM $700.00 per hour
6:00-7:00 PM (Meal Hour) Double Prevailing
Rate
7:00-9:00 PM (2 hour minimum
Guarantee) $700.00 per hour